Gallery # 3 of the Ingulskaya uranium ore mine has been installed
It was necessary to make changes to the original design, since during the execution of the work it was revealed that they were not located in the design position. This problem was effectively solved and with the help of a 400t crane the gallery was assembled in enlarged blocks with conveyor equipment.