Overpass at Dniprovskiy Descent

  • F
  • т 2000

Kyiv, Ukraine

  • news image Overpass at Dniprovskiy Descent
  • news image Overpass at Dniprovskiy Descent
  • news image Overpass at Dniprovskiy Descent

High design and engineering requirements. Use of low-alloy steels 10ХСНД (10KhSND) and 15ХСНД (15KhSND). Fabrication and delivery of oversized steel structures in 3 months made possible using two Ukrstalkonstruktsiya plants.

Client
Design
Fabrication
Ukrstal Construction
Erection
Back to lists