Fabrication of a building for coal-pulverizing section (CPS) for coal injection (CI) into blast furnaces No. 1, 3, 5
All Ukrstalkonstruktsiya plants were engaged for the fabrication of steel structures, with the fabrication and erection performed according to a tight schedule
Reconstruction of the thermal power unit No. 2. Semi-dry flue gas desulfurization plant