OVERPASS AT DNIPROVSKIY DESCENT
T2000
В
Kyiv, Ukraine
High design and engineering requirements. Use of low-alloy steels 10ХСНД (10KhSND) and 15ХСНД (15KhSND). Fabrication and delivery of oversized steel structures in 3 months made possible using two Ukrstalkonstruktsiya plants.
PRODUCTION
Ukrstal Construction